HAZHazardsSafety Management
An aviation hazard register, built on bow-ties.
In 50 words
A hazard register lists what could cause harm, the risk each hazard carries and the controls that hold it back. In eAviora every hazard sits on its risk family’s bow-tie, with threats, consequences and named barriers, and each barrier is rated whenever an event tests it.
- Overview
- Workflow
- Linked
- Discussion
- History
A hazard, in treatment
01, done02, done03, done04, current05, not reached06, not reached
Next step, waiting onA treatment decision
Linked toOCC | INV | SPI | CAP
At a glance
The module, on one sheet.
Module sheet | HAZ
SuiteSafety Management | Safety Operations
ICAO Annex 19Component 2, safety risk management. FAA Part 5 uses the same component.
RecordsSMS-HAZ hazards, each on its risk family’s bow-tie
Stages
01Identify02Assess03Barriers04Treat05Monitor06Review
In the box
85bow-tie models
682named barriers
What it does
Four things, done on the record.
- High descent rate: one barrier, ineffective
- Excessive pitch-up: one barrier, effective
- Bounced landing: one barrier, effective
- Gust beyond limits: two barriers, missing, then partially effective
- Weight or balance: one barrier, effective
- Structural damage: one barrier, effective
- Hidden damage: one barrier, effective
- Hull loss: one barrier, not assessed
- Occupant injury: one barrier, effective
EffectivePartially effectiveIneffectiveMissingNot assessedAbnormal Runway Contact | RF-01-003 | one of 85 bow-tie models | sample ratings
01A bow-tie per risk familyThreats, the top event and consequences on one model, with the barriers between them named.
02Barriers rated when testedEffective, partially effective, ineffective or missing: each barrier an event tested is rated by a person.
03Initial and residual riskScored on the ICAO 5 by 5 matrix, with the forecast residual and who approved it.
04Where each hazard came fromA hazard report, an occurrence trend, an audit finding, a risk assessment, a flight data event or a proposed change.
In the product
A hazard, in treatment.
- Overview
- Workflow
- Linked
- Discussion
- History
The next stepThe next step and what it waits on.
- A treatment decision, not yet
- Its rationale, not yet
- A mitigation plan, not yet
On the recordInitial risk and the forecast residual, on the same matrix.
On the recordThe occurrences that relate to it and the action that mitigates it.
The rule it holds
A barrier nobody has assessed is not counted as protection.
- Barrier health shows an unrated barrier as not assessed, never as effective.HazardsHolds
On the graph
What it links to.
OCC | Linked recordOccurrencesRelate to the hazard they show.
- From
- OCC
- To
- HAZ
- From
- INV
- To
- HAZ
- From
- SPI
- To
- HAZ
- From
- CAP
- To
- HAZ
Also in Safety OperationsOccurrencesFlight Risk AssessmentAerodrome Risk AssessmentInvestigationsThe Safety Management suite
Questions buyers ask
Short answers.
No. The library ships 85 bow-tie models with 682 named barriers. You assess them against your operation and add hazards of your own.
Risk is scored on the ICAO 5 by 5 matrix, the same for every operator, so a band means the same thing wherever it is read.
A hazard report, an occurrence trend, an audit finding, a risk assessment, a flight data event or a proposed change. The source stays on the record.
Reading | Risk and intelligenceThe Bow-Tie Without the SpreadsheetReading | Risk and intelligenceHow to Run a Part 5 SMS Gap Analysis in Three WeeksReading | Risk and intelligenceReplacing Spreadsheets and Email With an SMS: What Actually Changes
All of Risk and intelligenceSee Hazards on your own records.
A walkthrough with the people who build eAviora.