Skip to content
FRSign inBook a walkthrough
ARAAerodrome Risk AssessmentSafety Management

Aerodrome risk assessment, current for every aerodrome you serve.

In 50 words

An aerodrome risk assessment rates what makes an aerodrome demanding to operate into: its approach, terrain, obstacles, runway and rescue cover. In eAviora each aerodrome is categorised A, B or C against EASA, FAA or ICAO criteria, approved by the role its category requires, and flagged for revalidation before its approval ends.

Case file | SMS-ARA-2026-0007Stage 4 of 5, Valid
  • Overview
  • Workflow
  • Linked
  • Discussion
  • History
An aerodrome assessment, approved
01Draft, done02Assess, done03Approve, done04Valid, current05Superseded, not reached
Linked toFRAT | HAZ | SPI
Sample data | Northwind Air, a fictional airline
At a glance

The module, on one sheet.

Module sheet | ARA
SuiteSafety Management | Safety Operations
CriteriaEASA CAT.OP.MPA.105 categories, FAA 14 CFR 121.445 special airports, or ICAO Annex 6 and 14 with Doc 8168
EASAFAAICAO
RecordsSMS-ARA assessments, each replaced by the next when it is revalidated
Stages
01Draft02Assess03Approve04Valid05Superseded
RevalidationFlagged 30 days before the approval ends30
What it does

Four things, done on the record.

Montréal-Trudeau, CYUL, on the EASA criteria9 of 9 answered | Sample data | Northwind Air, a fictional airline
Category B, set by the most severe answerBA criterion nobody has verified is answered Unknown, which holds the category at C.
01Categorised A, B or CThe most severe answer across the criteria sets the aerodrome’s category.
02Unknown is never lowA criterion nobody has verified is answered unknown, which holds the category at C until it is resolved.
03Conditional approvals, trackedEach condition has an owner and can carry a due date, and is marked met with a note.
04Proposed from aerodrome dataeAvy reads the aerodrome’s data and proposes a category for each criterion; a person decides.
In the product

An aerodrome assessment, approved.

Case file | SMS-ARA-2026-0007Stage 4 of 5, Valid
  • Overview
  • Workflow
  • Linked
  • Discussion
  • History
On the recordThe answer to each criterion, and the category they set.
Category B, set by the most severe answer
The approvalThe approval decision, who approved it and the conditions still open.
  • Brief the winter operations plan before the first winter rotation, not yet
  • Add the curfew window to the dispatch release, done
Approved with conditions | C. Wright, Director of Safety | 1 open of 2
On the recordWhen the approval ends, and when revalidation opens.
Signed2026-11-09Revalidation opens2027-10-10Approval ends2027-11-09in 364 days
Sample data | Northwind Air, a fictional airline
The rule it holds

The category decides who may approve.

  • Approval is refused unless the signer’s role clears the rank the category requires; by default, Category C needs a postholder.Aerodrome Risk AssessmentHolds
  1. ACategory A
  2. BCategory BApproved by C. Wright, Director of Safety
  3. CCategory CA postholder, by default
Questions buyers ask

Short answers.

Three catalogs ship: EASA’s A, B and C categorisation, the FAA’s special-qualification airports, and an ICAO baseline from Annexes 6 and 14 and Doc 8168.

Reading | Risk and intelligenceWhat Is a FRAT (Flight Risk Assessment Tool)?Reading | Risk and intelligenceHazard vs Risk in Aviation: What Is the Difference?Reading | Risk and intelligenceThe Aviation Risk Model, In the Box: 85 Bow-Ties, 682 Barriers, 516 Indicators
All of Risk and intelligence

See Aerodrome Risk Assessment on your own records.

A walkthrough with the people who build eAviora.