Skip to content
FRSign inBook a walkthrough
REGRegulatory ChangesCompliance & Regulatory

Regulatory change management for aviation, from new edition to proof.

In 50 words

Regulatory change management tracks each change in the rules you operate under, from publication to the day your operation complies. In eAviora a new edition is compared with the wording you hold, requirement by requirement, and each change is assessed, implemented through actions and sealed only on evidence.

Case file | REG-2026-0021Stage 3 of 4, Implementation
  • Overview
  • Workflow
  • Linked
  • Discussion
  • History
A regulatory change, in implementation
01Identified, done02Impact assessment, done03Implementation, current04Closure, not reached
Next step, waiting onAn action plan
Linked toCMP | CAP | DMS | Intelligence Watch
Sample data | Northwind Air, a fictional airline
At a glance

The module, on one sheet.

Module sheet | REG
SuiteCompliance & Regulatory | Regulatory Intelligence
New editionsA new edition from the eAviora library, compared with the requirements you hold
FromIOSA edition 18ToIOSA edition 1964 changes, 41 validated
Change classesFrom a typo or renumbering to a new or modified obligation, each rated by materiality
RecordsREG regulatory changes
Stages
01Identified02Impact assessment03Implementation04Closure
What it does

Four things, done on the record.

FLT 3.4.2 | the wording you hold, against edition 19

The operator shall ensure flight crew complete removed: annual added: recurrent, at intervals not exceeding 12 months, training in landing in gusting crosswind conditions.

Modified obligation | material | IOSA edition 18 to 19 | Sample data | Northwind Air, a fictional airline
Each change classified
ORG 1.1.4A typo correctedEditorial | no effect
DSP 2.3.1Renumbered from DSP 2.2.6Moved | no effect
MNT 1.6.2Now MNT 1.6.2 and 1.6.3Split | material
CAB 4.1.1Withdrawn from edition 19Retired | material
SEC 3.2.5Added in edition 19New obligation | material
Validated by a person
01New editionsMove to a new edition from the eAviora library and compare each requirement with the wording you hold.
02Each change classifiedEditorial, moved, split, retired or a new obligation, with its materiality, validated by a person.
03Impact, proposed and acceptedeAvy can propose an impact assessment against your mapped document sections and evidence; a person accepts or dismisses it.
04A record per changeApplying a validated change creates its record, linked to every requirement mapped to it.
In the product

A regulatory change, in implementation.

Case file | REG-2026-0021Stage 3 of 4, Implementation
  • Overview
  • Workflow
  • Linked
  • Discussion
  • History
The next stepThe next step and what it waits on.
  • An action plan is written, not yet
  • The plan has an owner, A. Laurent, not yet
Stage 3 of 4 | Implementation
On the recordThe gap analysis and the processes the change affects.
GapCrosswind training recurs every 24 months today
ProcessFlight crew trainingthe training program manual, section 5.3
Proposed by eAvy, accepted by M. Tremblay
On the recordThe requirements it touches and the actions that close the gap, linked.
REQ-2026-0118FLT 3.4.2 Crosswind landing trainingtouches requirement | declaration gap
DOC-2026-0063Training program manual, 5.3assessed against | revision 7
ACT-2026-0247Move crosswind training to a 12-month cyclecloses the gap | open
Sample data | Northwind Air, a fictional airline
The rule it holds

A change is not implemented until it is evidenced.

  • A regulatory change seals as implemented only with attached proof or a written summary of the evidence.Regulatory ChangesHolds
01Identified
02Impact assessment
03Implementationseals only with attached proof or a written summary of the evidence
04Closure
Questions buyers ask

Short answers.

No. eAviora does not pull publications from an authority. You bring a new edition in, and the product compares it with the requirements you hold.

Reading | EASA and internationalIOSA Compliance Software: How Airlines Can Link ISARPs, Evidence, Findings and Corrective ActionsReading | EASA and internationalFAA Part 5 SMS Final Rule: Requirements, Coverage, and DeadlinesReading | EASA and internationalWhy Compliance Alone Cannot Prevent Incidents
All of EASA and international

See Regulatory Changes on your own records.

A walkthrough with the people who build eAviora.